|
PSI Capacity Requirements
Planning (CRP) provides a comprehensive set of tools that are used to
create, adjust and measure machine loading. This module will allow your
company to determine the machine and labor resources necessary to execute
production plans. These plans may be either actual or simulations. Other
features of the system include:
- Load shuffling through the work center hierarchy
- Highlighting of urgent emergent issues
- Multi-level requirements pegging
- Graphical representations
- Variable planning periods
In addition,
this module also allows you to see the effects of shift changes or overtime
on your production plans. On-line dispatch lists inform floor personnel
of priority changes.
Also included
are tool planning functions which log tool life cycles, maintenance needs,
and job needs to provide a complete picture of your plan requirements.
|